---
title: "Structural Cabling: 52 Drops of Cat6 in Concord, Ontario, Canada"
description: A predictive wireless design survey using 10 Cisco C9120AXI access points mounted on the drop ceiling in office area and on the metal bar in the warehouse.
image: https://www.usorion.com/hubfs/Imported%20sitepage%20images/rs=w1280-Jun-25-2024-04-56-33-0512-PM.jpg
---

- About
  
  
  
    - [About](https://www.usorion.com/about-us)
- Services
  
  
  
    - [Wireless Surveys (Ekahau)](https://www.usorion.com/wireless-site-surveys)
    - [Structured Cabling Services](https://www.usorion.com/structured-cabling-solutions)
    - [Fiber Consultancy & Installations](https://www.usorion.com/fiber-consultancy-installations)
    - [Colocation Deployment & Migration](https://www.usorion.com/colocation-deployment-migration-infrastructure-services)
    - Talent Acquisition Services
      
      
      
          - [Talent Acquisition](https://www.usorion.com/talent-acquisition)
          - [Job Vacancies](https://jobs.crelate.com/portal/usorion/)
- [Coverage](https://www.usorion.com/coverage)
- Resources
  
  
  
    - [Newsletter](https://www.usorion.com/orion-us-newsletter-connect)
    - [Data Dictionary](https://www.usorion.com/data-dictionary)
    - [Blog](https://www.usorion.com/blog)

[![logo](https://www.usorion.com/hs-fs/hubfs/USOrionLogoNew.png?width=654&height=260&name=USOrionLogoNew.png "logo")](https://www.usorion.com/)

[+1 (803) 724 1204](tel:+1%20(803)%20724%201204)

[sales@usorion.com](mailto:sales@usorion.com)

[contact us](https://23748016.hs-sites.com/contact-us-orion-us)

# Blog

 Find out more ![Banner arrow - Usorion](https://www.usorion.com/hubfs/Icons/banner-arrow.webp)

![survey_perks](https://www.usorion.com/hubfs/survey_perks.png)

![Structural Cabling ](https://www.usorion.com/hubfs/Imported%20sitepage%20images/rs=w1280-Jun-25-2024-04-56-33-0512-PM.jpg)

## Structural Cabling: 52 Drops of Cat6 in Concord, Ontario, Canada

 19 August 2024

Orion US completed an office buildout for a multinational company for their branch in Concord and Kitchener, Ontario, Canada. The project involved the installation of 52 cat6 cable drops in an office setting in Concord and 8 cat6 cable drops in the Kitchener warehouse. The two-man crew of highly specialized structural cabling technicians was deployed for 4 days to complete the work.

The details of the work are below:

1. Install 2 Drops for Wireless Access Points

2. Install 50 Drops for Data

3. Install client-provided network cabinet with fire-rated plyboard

4. Install 3 Meraki Switches and patch all the connections to the switch ports

5. Terminate, Test, and Certify all the drops

### **Network Cabinet Installation and Patch to the Meraki Switches**

All 52 Cat6 cables were terminated in a patch panel in the network cabinet. 3 counts of 24 ports Cisco Meraki Switches were installed and all the connections were patched as per the instruction from the client.

![rs=w1280-Jun-25-2024-04-56-33-0512-PM](https://www.usorion.com/hs-fs/hubfs/Imported%20sitepage%20images/rs=w1280-Jun-25-2024-04-56-33-0512-PM.jpg?width=763&height=252&name=rs=w1280-Jun-25-2024-04-56-33-0512-PM.jpg)               * Image of Network Cabinet with 3 switches and patch panel*

### **Network Jack End in Office Area**

The below image shows the termination of a few jacks out of 52 drops in the office and warehouse area on site. Each of these jacks was terminated and tested with a Fluke cable certifier. A pdf report was generated and submitted to the client along with a final installation of the report.

![rs=w1280-Jun-25-2024-04-58-01-6133-PM](https://www.usorion.com/hs-fs/hubfs/Imported%20sitepage%20images/rs=w1280-Jun-25-2024-04-58-01-6133-PM.jpg?width=763&height=310&name=rs=w1280-Jun-25-2024-04-58-01-6133-PM.jpg)

        *                                                          Image of a few jacks termination in office area on site.*

Please [get in touch](https://www.usorion.com/contact-us-orion-us) with the experts at Orion US today.

[![Book Your Wireless Survey Long CTA - Green](https://www.usorion.com/hs-fs/hubfs/CTAs%20-%20Wireless%20Surveys/Book%20Your%20Wireless%20Survey%20Long%20CTA%20-%20Green.webp?width=735&height=268&name=Book%20Your%20Wireless%20Survey%20Long%20CTA%20-%20Green.webp)](https://www.usorion.com/contact-us-orion-us)

Image Source: [Canva](https://www.canva.com/photos/MADI_h087RQ-women-working-with-cables-in-data-center/)

[linkedin-in icon](https://www.linkedin.com/company/usorion/) [twitter icon](https://twitter.com/UsOrion_)

### Posts By Topics

- [Wireless Site Survey (44)](https://www.usorion.com/blog/tag/wireless-site-survey)
- [Ekahau Site Survey (40)](https://www.usorion.com/blog/tag/ekahau-site-survey)
- [USA (26)](https://www.usorion.com/blog/tag/usa)
- [WIFI Survey (26)](https://www.usorion.com/blog/tag/wifi-survey)
- [Canada (22)](https://www.usorion.com/blog/tag/canada)
- [Predictive Wireless (20)](https://www.usorion.com/blog/tag/predictive-wireless)
- [Structured Cabling (14)](https://www.usorion.com/blog/tag/structured-cabling)
- [Design (11)](https://www.usorion.com/blog/tag/design)
- [Pre-Deployment Survey (11)](https://www.usorion.com/blog/tag/pre-deployment-survey)
- [Cat6 (7)](https://www.usorion.com/blog/tag/cat6)
- [Passive Site Survey (7)](https://www.usorion.com/blog/tag/passive-site-survey)
- [Talent Acquisition (7)](https://www.usorion.com/blog/tag/talent-acquisition)
- [Wired Site Survey (7)](https://www.usorion.com/blog/tag/wired-site-survey)
- [MDF/IDF Setup (5)](https://www.usorion.com/blog/tag/mdf-idf-setup)
- [Optimizing Wireless Network (5)](https://www.usorion.com/blog/tag/optimizing-wireless-network)
- [Cisco Meraki (4)](https://www.usorion.com/blog/tag/cisco-meraki)
- [Post Survey (4)](https://www.usorion.com/blog/tag/post-survey)
- [Structuring Cabling Install (4)](https://www.usorion.com/blog/tag/structuring-cabling-install)
- [APOS Survey (3)](https://www.usorion.com/blog/tag/apos-survey)
- [Network Installation (3)](https://www.usorion.com/blog/tag/network-installation)
- [AP-On-a-Stick (2)](https://www.usorion.com/blog/tag/ap-on-a-stick)
- [Fiber Splicing (2)](https://www.usorion.com/blog/tag/fiber-splicing)
- [Site Survey (2)](https://www.usorion.com/blog/tag/site-survey)
- [Arkansas (1)](https://www.usorion.com/blog/tag/arkansas)
- [Cable Management (1)](https://www.usorion.com/blog/tag/cable-management)
- [Cabling Standards (1)](https://www.usorion.com/blog/tag/cabling-standards)
- [Documentation (1)](https://www.usorion.com/blog/tag/documentation)
- [Ekahau Heatmap (1)](https://www.usorion.com/blog/tag/ekahau-heatmap)
- [Manitoba (1)](https://www.usorion.com/blog/tag/manitoba)
- [Network (1)](https://www.usorion.com/blog/tag/network)
- [On-Site Survey (1)](https://www.usorion.com/blog/tag/on-site-survey)
- [Routers (1)](https://www.usorion.com/blog/tag/routers)
- [Switches (1)](https://www.usorion.com/blog/tag/switches)
- [WAPs (1)](https://www.usorion.com/blog/tag/waps)

see all

### Articles

[From Floorplan to Deployment: What Happens Before the First Access Point Is Installed?](https://www.usorion.com/blog/from-floorplan-to-deployment-what-happens-before-the-first-access-point-is-installed)

[Why Network Documentation Is Critical for Maintenance, Upgrades, and Future Growth](https://www.usorion.com/blog/why-network-documentation-is-critical-for-maintenance-upgrades-and-future-growth)

[How Ekahau Heatmaps Help Eliminate Wi-Fi Dead Zones Before Deployment](https://www.usorion.com/blog/how-ekahau-heatmaps-help-eliminate-wi-fi-dead-zones-before-deployment)

[Predictive vs On-Site Wireless Surveys: Which One Does Your Business Really Need?](https://www.usorion.com/blog/predictive-vs-on-site-wireless-surveys-which-one-does-your-business-really-need)

### Subscribe to our blog

### Need more information? Talk to us today.

- [+1 (803) 724 1204](tel:+1%20(803)%20724%201204)
- [sales@usorion.com](mailto:sales@usorion.com)

- [Wireless Surveys (Ekahau)](https://www.usorion.com/wireless-site-surveys)
- [Cabling](https://www.usorion.com/structured-cabling-solutions)
- [Talent Acquisition](https://www.usorion.com/talent-acquisition)

- [About Us](https://www.usorion.com/about-us)
- [Coverage](https://www.usorion.com/coverage)

Copyright 2023 Orion Global Managed Services US, Inc.  
All rights Reserved. Designed and Developed by [JDR Group](https://www.jdrgroup.co.uk/).

[Follow us on LinkedIn](https://www.linkedin.com/company/usorion/) [Follow us on Twitter](https://twitter.com/UsOrion_) [Like us on Facebook](https://www.facebook.com/profile.php?id=61572939841282) [Follow us on Instagram](https://www.instagram.com/orionusinc/)

- [Terms and Conditions](https://www.usorion.com/terms-conditions)
- [Privacy](https://www.usorion.com/privacy-policy)
- [Cookie](https://www.usorion.com/cookie-policy)

![](https://px.ads.linkedin.com/collect/?pid=5095450&fmt=gif)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Orion US",
    "url" : "https://www.usorion.com/blog/author/orion-us"
  },
  "dateModified" : "2024-09-04T23:15:10.610Z",
  "datePublished" : "2024-08-19T21:38:24.000Z",
  "headline" : "Structural Cabling: 52 Drops of Cat6 in Concord, Ontario, Canada",
  "image" : [ "https://www.usorion.com/hubfs/Imported%20sitepage%20images/rs=w1280-Jun-25-2024-04-56-33-0512-PM.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.usorion.com/blog/structural-cabling-52-drops-of-cat6-in-concord-ontario-canada",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.usorion.com/hubfs/USOrionLogoNew.png"
    },
    "name" : "Orion Global Managed Services US, Inc."
  }
}
```